Solar Pile Pre-Drilling in Arkansas
Refusal-Zone Expertise. Fastest Time-to-Field in the Industry.
Pre-Drilling Where Traditional Methods Fail
Claypan. Fragipan. Cemented gravel.
The Delta and South-Central regions of Arkansas present some of the most refusal-prone soils in the country for utility-scale solar foundations.
At Aggregate Resource Drilling, LLC (an Indian Economic Enterprise and affiliate of ARI, Inc.), we specialize in precision pile pre-drilling where standard driving or augering fails — and we do it at the scale and speed required to keep your solar project on track.
We Know the Soil—and What Stops Progress
Arkansas field teams routinely encounter and overcome:
High-plasticity clays with extreme shrink-swell behavior
Layered clays over shallow sedimentary rock
Cemented silts and gravel beds that destroy production
Perched water zones that shift friction dynamics in real time
If your racking torque test results are inconsistent — or you’re projecting refusal at more than 5% of piles — it’s time to pre-drill.
Not on the Critical Path — That’s the ARI Standard
We know pre-drilling is the one thing no one wants to hold the project up.
That’s why we structure every scope to mobilize quickly, scale as needed, and operate with the reliability expected from a prime contractor.
No lagging crew counts. No unanswered emails. No QA gaps.
Just safe, on-spec drilling and verified data — delivered faster than expected.
Why ARI for Arkansas Solar?
Pre-drilling is our specialty. Not a side service.
SmartROC + DTH rigs with GPS bore logs and electronic as-builts
IRA-compliant labor through DOL-Registered Drilling Apprenticeship Program
IEE-qualified for enhanced tax credit projects (tribal, federal, or energy community)
Field teams trained for high humidity, saturated soils, and high-density layouts
Proven ability to mobilize multiple rigs simultaneously
Your Refusal Zones Are Our Sweet Spot
We actively serve solar contractors and developers working in:
Eastern Arkansas (Mississippi Alluvial Plain)
South-Central counties with silt/clay over rock profiles
Transition regions near ridge zones or seasonal wetlands
Energy communities targeted for IRA development
You’ll never see us scrambling to respond to field changes — we’ve already planned for them.
Let’s Get Your Project Moving
If you’re building in Arkansas and refuse to let refusals dictate your schedule — let’s talk.
Contact our pre-drill team for bid support, scope clarification, or crew availability.
When you hit rock in your solar project and you need a high-production drilling team to help you stay on schedule, ARI can quickly mobilize a fleet of rock drills to pre-drill the solar panel foundation piles.
